Skip to content

For many food processors, getting rid of process wastewater is a daily operational burden that never quite goes away. Land application through center pivot irrigation has long been a go-to method, but anyone who has run pivots on process water knows the reality: nozzles clog, equipment breaks down, crews spend hours in the field, and the whole system is only as good as its last repair.

A Perdue Farms pork processing facility in Iowa decided there was a better way. In the video below, we walk through how the plant moved away from its pivots and onto Evaporation King’s enhanced evaporation technology.

Watch the installation video

▶ Watch: Perdue Farms – Pork Processing Water

The Problem with Pivots

Center pivots were designed to irrigate crops with clean water, not to dispose of processing wastewater. When they’re pressed into that role, the weak points show up fast:

  • Clogging. Solids, fats and other constituents in process water foul nozzles and lines, reducing distribution and forcing frequent cleanouts.
  • High maintenance. Moving parts spread across acres of field mean constant inspection, repair and downtime.
  • Dependence on land and season. Pivots need suitable ground and conditions to apply water, which limits when and how much a plant can discharge.

For the Iowa facility, the maintenance load had become a real cost — in labor, in parts, and in the uncertainty of whether the system would be ready when the plant needed it.

The SWITCH: Three Gladiator 120 Systems

Rather than keep patching the pivots, the plant installed three Gladiator 120 enhanced evaporation systems from Evaporation King.

The Gladiator works on a simple idea: make the water easy for nature to evaporate. Its high-speed rotary atomization breaks process water into very fine droplets. That huge increase in surface area lets wind, temperature and humidity do the work, driving evaporation without the energy-hungry heating that thermal evaporators depend on.

Smarter Operation with Automated Weather Droplet Control

Evaporation performance depends on the weather, so the systems don’t run blind. Each installation includes automated weather monitoring and control, which adjusts operation to current conditions. The system runs when conditions favor evaporation and backs off when they don’t, keeping operation efficient without someone having to babysit it. An optional remote monitoring feature lets operators check on the system from anywhere.

What the Plant Gained

  • Lower maintenance compared with keeping a pivot network running on process water
  • Lower operating costs, since evaporation is driven by ambient conditions rather than thermal energy
  • More predictable wastewater management with automated, weather-aware control
  • A smaller operational footprint than field-scale land application

Is Your Facility Fighting the Same Battle?

If your team spends more time fixing pivots than running your plant, Perdue Farms’ experience is worth a look. Enhanced evaporation can reduce wastewater volumes with far less hands-on effort, and the Gladiator line scales across a range of flow rates.

Talk to Evaporation King about whether enhanced evaporation fits your process water.

Previous
How Best Beef Broke Through a Wastewater Bottleneck — and Unlocked Room to Grow

Find the Right Gladiator.

Every model shares the same proprietary atomization technology and 300K+ TDS tolerance. The difference is volume — match the system to your pond.

60S — Solar 60 GPM Gladiator 80 80 GPM Gladiator 120 120 GPM Most Popular Gladiator 720 720 GPM
Flow Rate 60 GPM 80 GPM 120 GPM 720 GPM
Power Source 100% Solar (optional grid) Grid Power Grid Power Grid Power
Max TDS 300K+ 300K+ 300K+ 300K+
Operating Cost $0 <$1 per 1000 gallons <$1 per 1000 gallons <$1 per 1000 gallons
Grid Required ✕ ✓ ✓ ✓
Trailer Mount ✓ — — —
Adjustable Mast 4–12 ft — 4–12 ft 4–12 ft
Auto Shutoff — ✓ ✓ ✓
Built-in Walkway — — — ✓
WDC Compatible ✓ ✓ ✓ ✓
Modular / Stackable ✓ ✓ ✓ ✓
Best For Remote / Off-Grid Entry Commercial Most Operations High Volume
Gladiator vs Hauling & Underground Disposal
$0
Hauling fees after purchase
None
Disposal well needed
Zero
Civil construction required
<12 months
Typical payback period