Skip to content

Climate Modeling

Built for Your Site

Most operators choose evaporation equipment based on rules of thumb. Our engineers use 10+ years of localized NOAA data to model your exact site conditions — temperature, humidity, wind patterns, and solar radiation — and deliver precise performance projections before you spend a dollar.

The analysis shows you exactly what each month looks like: peak summer evaporation capacity, winter limitations, expected downtime, and the specific Gladiator configuration that matches your volume and TDS. It eliminates the guesswork that leads to over-built systems and wasted capital.

01
10-Year Weather Data Analysis

Historical temperature, humidity, wind patterns, and solar radiation pulled from NOAA weather stations closest to your facility. Your projections are built on real data, not regional averages.

02
Month-by-Month Capacity Projections

See exactly what your system can handle in January versus July. Know your seasonal floor so there are no surprises during low-performance months.

03
Equipment Recommendation

Specific model and configuration matched to your climate conditions and wastewater volume. Stop guessing at system size and avoid the capital waste of oversized equipment.

04
ROI Against Your Current Disposal Cost

Line-by-line comparison of evaporation operating costs versus your current disposal method, with payback timeline and 5-year savings projection.


Find the Right Gladiator.

Every model shares the same proprietary atomization technology and 300K+ TDS tolerance. The difference is volume — match the system to your pond.

60S — Solar 60 GPM Gladiator 80 80 GPM Gladiator 120 120 GPM Most Popular Gladiator 720 720 GPM
Flow Rate 60 GPM 80 GPM 120 GPM 720 GPM
Power Source 100% Solar (optional grid) Grid Power Grid Power Grid Power
Max TDS 300K+ 300K+ 300K+ 300K+
Operating Cost $0 <$1 per 1000 gallons <$1 per 1000 gallons <$1 per 1000 gallons
Grid Required
Trailer Mount
Adjustable Mast 4–12 ft 4–12 ft 4–12 ft
Auto Shutoff
Built-in Walkway
WDC Compatible
Modular / Stackable
Best For Remote / Off-Grid Entry Commercial Most Operations High Volume
Gladiator vs Hauling & Underground Disposal
$0
Hauling fees after purchase
None
Disposal well needed
Zero
Civil construction required
<12 months
Typical payback period